Free site survey · Written quotation0800 088 6248WhatsApp

Shutters & security

Insulated roller shutters

Put simply, insulated roller shutters are foam-filled twin-wall laths for thermal and noise benefit, measured on site and installed by one team from survey to sign-off.

Line drawing of insulated roller shutter
from £1,850plus VAT, standard opening
2-3 weekstypical lead time
Freesite survey

How it is made

Finish and colour are chosen to suit the street as well as the level of security needed. The shutter box, guides and bottom rail are sized to the opening and fixed to sound structure. Insurers often specify a lock type or rating, so we confirm their wording before ordering.

How we handle it

Shutters get used twice a day, every day, so we fit motors, springs and guides that stand up to it and we repair the ones that do not.

Options and specification

  • Foam-filled core
  • Reduces draughts through the opening
  • Quieter operation than single-skin laths

How much do insulated roller shutters cost?

The entry price is about £1,850 plus VAT. Size, specification and strip-out decide the exact number. Your price is held for 90 days.

How long does it take?

Expect 2-3 weeks after survey for manufacture. Installation in your is usually a day or two once everything is made. We can fit on a day the business is shut.

Where we fit insulated roller shutters

Across all 12 Midlands counties. Pages for the larger centres:

Questions about insulated roller shutters

What do you need from me to quote?

The address, roughly what you want, and a photo of the current frontage. Opening sizes help but are not essential, because we measure at survey anyway.

How much does insulated roller shutters cost near me?

Insulated roller shutters start from around £1,850 plus VAT for a standard opening. The exact figure depends on the width, height, finish and access, and comes from a free site survey as a written, itemised quotation.

Do I need planning permission near me?

Like-for-like replacements usually do not. Changing the appearance of the frontage, fitting an external roller shutter or adding an illuminated sign usually needs consent from your local council. We tell you which applies at survey.

How long does it take?

Lead time for insulated roller shutters is typically 2-3 weeks after survey. Installation itself is usually one to two days on site for a standard unit.

Find out what your frontage will cost

Free survey across the Midlands, a written itemised quotation, and no obligation.

CallFree survey